Thursday, June 13, 2013

Recent Update


Although there has been some rather severe weather this week they were able to dodge some rain drops and still make significant progress on our new home. They were able to tie in to the city water and sewer mains as well as install ground works (the pipes beneath the basement slab). They installed a drain tile system (a below grade drainage system that prevents water from building up around the foundation) and were able to backfill the dirt up against the basement walls. They plan to prep and pour the basement slab Friday or Monday, and then they will be ready to begin framing! (Thanks Phil, for the specific details and pics!)